Home Page Photo Stuff Weather Hurricane Info Boating Links Tide Charts Weather Station Past Trip Logs
2006 - September - Allied Crane 
.. with the Boom all but vertical the next step was to install the Pins that secure the Base of the Back Brace of the Boom .. thus far everything was going 'just like the book' .. the sequence of photos below were taken as the Boom was brought to a vertical position and an attempt to secure the Back Brace failed causing the Boom to free fall until the Back Brace became wedged to the Roof Structure of the Crane .. at this time the all of the Rigging Crew jumped free of the Crane for safety ..
.. after the near disaster Allied moved their 60 Ton Grove into position to temporally hold the Lorain Crane Boom in position until a larger Crane could be brought in to reposition the Boom of the Lorain Crane  ..
.. with the Lorain Crane secured Allied waited for one of their large Cranes to arrive from Naples Florida ..
 
Link to Page A or Page B or Page C or Page D or Page E or Home Page
Home Page Photo Stuff Weather Hurricane Info Boating Links Tide Charts Weather Station Past Trip Logs